SUPPLIERS

Procurement Policy

Etimaad purchasing policy is to procure material and services from trustworthy sources in a professional, ethical, competitive and cost effective manner consistent with the Company policies, procedures and business objectives while promoting supplier relationships that create added value.

Etimaad is committed to establish a mutually beneficial relationship with local and foreign vendors and suppliers in order to provide efficient services to international client related to Power Plants, oil and gas industry, water treatment plant and civil construction. Etimaad aims to instill effectiveness in its operations through optimizing the supply chain.

Etimaad believes in providing equal and fair opportunities to the local and international suppliers with an objective to develop them as long term business partners. As a result, Etimaad has a huge variety of qualified companies in all fields of contractor services and supplies.

 

Procurement Capabilities

Recognizing the importance of cost effective and efficient procurement for timely completion of the project, we possess a wide ranging procurement network, which enables us to purchase material and equipment from anywhere in the world, at best possible price and delivery schedule.

We have established strategic alliances and long-term relationships with our suppliers, to ensure that the quality and delivery requirements of the job are positively met. These arrangements also enable us in getting volume discounts, which ultimately help us keeping our prices competitive.

Etimaad has comprehensively trained procurement professionals, who continuously update and revise the data bank of suppliers and vendors by using pre-qualification criteria.

Quality during manufacturing at vendor premises is controlled by necessitating the witness of critical activities, employing third party inspection at supplier’s premises.

We utilize well known software of Procuremax for material requisitioning, purchasing, expediting, inspection, receiving and issuance. This software also enables us to keep a control over budget allocated at the inception of the specific project and timely payments to suppliers.

 

Procurement Decision Key Factors

Best service, after sale service and support.

Minimum operating cost because fuel efficiency is a major factor.

Quality including reliability, durability and all around safety is preferable than price.

 

What We Purchase

  • Earth Moving Equipment
  • Concrete Equipment
  • Welding Equipment
  • Steel Structure
  • Transformers
  • Generators
  • Turbine
  • Compressors
  • Boilers and boiler parts
  • Cooling Towers
  • DCS/ PLC System
  • Transformers
  • Cables
  • Electrical bulk
  • Instruments
  • Paints
  • Valves
  • Pipes
  • Pipe Fitting

WHAT CUSTOMER SAYS


We are pleased to advice that Etimaad Engineering is executing work to our satisfaction. We expect that they will continue to perform in an excellent manner on this project.

Zulqarnain Mustufa

Project Manager

Attock Gen Limited for Wartsila
The Etimaad team demonstrated a great sense of commitment and consistency in the project management capability , upholding strict quality and safety measures that helped us achieve the completion of our project within a record time of six months. PPR congratulates Etimaad for its contribution and successful completion of design review on this project of national significance.

Razi Ahmed

Director (Project Development)

Bhikhi Power Plant for Pakistan Power Resources, LLC
This is to certify that M/S Etimaad have successfully completed the job of "E-207, New Coil Installation & E-205 B/C, Coil Replacement." They have performed the job of good quality, timely, safely and according to the specifications provided to them. We wish to express our gratification for their efforts to complete the job within the specified duration and services rendered to our company..

Syed Masroor Ali

Maintenance Manager (Mechanical)

Fauji Fertilizer Company Limited
We really appreciate the response and services provided by M/S Etimaad for fixing the Super heater tubes leakages on our HRSG#4 during its forced shut down from 1st to 4th of November-08. We understand the special welding procedure requirement for the T91 material and the difficult location of the defective tubes made the tube welding a difficult task. However, the expertise available with M/S Etimaad Qatar, LLC helped to pass the welding in one go which in turn led to minimize the shut down on our HRSG#4. We are looking forward to the same sort of services in future from Etimaad Engineering helping us to enhance reliability of our plant.

Maqsood Ahmad

Maintenance Manager (Mechanical)

Fixing The Tube Leakages on Heat Recovery Steam Generator for AES Ras Laffan Operating Company (WL.L.), Qatar