PROJECTS HIGHLIGHTS
Sr.# |
Client Name |
End User |
Project Description |
Location |
1
|
PARCO
|
PARCO
|
EPC of kero merox unit including commissioning
|
Mahmood Kot, Pakistan
|
2
|
Weatherford-USA
|
Pakistan Petroleum Ltd
|
Electro Mechanical and Instrumentation erection works at Adam X-1 Hala early Production Facility
|
Hyderabad, Pakistan
|
3
|
Procter & Gamble
|
Procter & Gamble
|
Fabrication, supply and erection of Mechanical equipment for detergent plant
|
Karachi, |
Pakistan |
||||
4
|
DH Chemicals
|
DH Chemicals
|
Facility for 4000 M. Tons liquid Anhydrous Ammonia storage and handling on Turnkey Basis
|
Sheikhupura, Pakistan
|
5
|
OMV Pakistan
|
OMV
|
HAZOP Study of OMV’s Kadanwari Modification and Enhancement Projects
|
Kadanwari, Pakistan
|
6
|
Hyderabad Development Authority
|
Hyderabad Development Authority
|
Designing, Manufacturing, transportation, installation, erection and commissioning of Sewerage Treatment Plant
|
Hyderabad, Pakistan
|
7
|
DH Chemicals
|
DH Chemicals
|
Turnkey supply of Sodium Hydroxide storage and Decanting Facility
|
Sheikhupura, Pakistan
|
8
|
Procter & Gamble
|
Procter & Gamble
|
Civil construction of detergent plant
|
Karachi, |
Pakistan |
||||
9
|
General Electric
|
Sapphire Power Company Limited
|
Operation and maintenance management of 220 MW GTS based combined cycle power plant
|
Muridhke, Pakistan
|
10
|
General Electric
|
Saif Power Company Limited
|
Operation and maintenance management of 220 MW GTs based combined cycle power plant
|
Sahiwal,
Pakistan
|
11
|
Wartsila Pakistan
|
Nishat Chunian Power Limited
|
Civil and Mechanical construction works for 200 MW HFO based Combined Cycle Power Plant
|
Chunian, Pakistan
|
12
|
Wartsila Pakistan
|
Nishat Power Limited
|
Construction of Super Structure for 200 MW HFO based Combined Cycle Power Plant
|
Chunian, Pakistan
|
13
|
Hyderabad Development Authority
|
Hyderabad Development Authority
|
Turnkey supply of 10 million gallons per day of drinking water treatment plant for Hyderabad city
|
Hyderbad,
|
Pakistan |
||||
14
|
CKD - Czech Republic
|
Orient Power Company Limited
|
Electro mechanical construction for Balloki (220 MW) Combined Cycle Power Plant
|
Head Balloki, Pakistan
|
15
|
PAFL
|
PAFL
|
Fabrication and Supply of Tube Bundles for 2 Nos. of heat exchangers
|
Mianwali, Pakistan
|
16
|
Fauji Fertilizer Company Limited
|
Fauji Fertilizer Company Limited
|
Air pre-heater coil replacement of primary reformer
|
Mirpur Mathelo, Pakistan
|
17
|
Chashma Nuclear Power Plant
|
CHASNUP
|
Annual shutdown maintenance work for the complete power plant
|
Chashma Barrage,
|
Pakistan |
||||
18
|
Wartsila Pakistan
|
Attock Gen Power Limited
|
Civil, Mechanical, Piping fabrication & erection works for 160 MW Power Plant
|
Rawalpindi, Pakistan
|
19
|
BP Pakistan
|
British Petroleum
|
Turnaround Strategy documents for TURK Facilities Amine System
|
Sindh, Pakistan
|
20
|
Tuwairqi Steel
|
Tuwairqi Steel
|
Project Management Services
|
Pakistan
|
21
|
Wateen
|
Wateen
|
Supply of galvanized steel structure for communication towers
|
Pakistan
|
22
|
Win Com
|
Win Com
|
Supply of galvanized steel structure for communication towers
|
Pakistan
|
23
|
Iberdrola
|
Mesaieed Power Company
|
Services for skilled personnel for commissioning and testing of 2000 MW Power Plant
|
Mesaieed, Qatar
|
24
|
Hyundai Heavy Industries
|
Pearl GTL Project
|
Process Area Piping Installation and Test Works for Pearl GTL Project Feed Gas Preparation (FGP) Works
|
Ras Laffan, Qatar
|
25
|
Gama Construction
|
Qatar Gas
|
Fabrication and installation of pressure piping
|
Ras Laffan, Qatar
|
26
|
Technip
|
Qatar Gas
|
Erection and installation of thermal oxidizer for Olefin Project
|
Ras Laffan, Qatar
|
3%
|
AES
|
Raslaffan Power Company Ltd
|
Turnkey supply of Gas Turbine rotor extraction skid along with mounting trolleys
|
Ras Laffan, Qatar
|
28
|
Punj Lloyd – India
|
Qatar Petroleum
|
Fabrication and installation of dense phase ethylene & butane pipelines between Ras Laffan and Mesaieed
|
Abu Naklah , Qatar
|
29
|
AES
|
Raslaffan Power Company Ltd
|
Quality control and management services for rehabilitation of potable water tanks
|
Ras Laffan, Qatar
|
30
|
Gama Construction
|
Qatar Gas
|
Supplemental manpower for civil work activities
|
Ras Laffan, Qatar
|
31
|
Dodsal – UAE
|
Qatar Petroleum
|
Installation of screen cleaning system at common sea water intake structure for cooling water
|
Ras Laffan, Qatar
|
32
|
AES
|
Raslaffan Power Company Ltd
|
Re-tubing of waste heat recovery boiler
|
Ras Laffan, Qatar
|
33
|
JGC Middle East
|
Dolphin Energy
|
Maintenance works (at 100 m height) on HP and MP riser of flare stack
|
Ras Laffan, Qatar
|
34
|
Technip France
|
Ras Laffan Olefins Company Qatar
|
Services for Chemical Cleaning of Heat-Exchangers at RLOC Plant, Ras Laffan, Qatar
|
Ras Laffan, Qatar
|
35
|
Oryx GTL Limited
|
Oryx GTL Limited
|
Replacement of LPG Pipeline Ras Laffan Avenue
|
Ras Laffan, Qatar
|
36
|
Chiyoda-Hyyndai Heavy Industries Co Ltd.
|
Qatar Shell Pearl GTL Project
|
Process Area Piping Installation and Testing Works on Pearl GTL FGP (C4) Project
|
Ras Laffan, Qatar
|
37
|
Technip Middle East
|
Ras Laffan Olefins Company
|
Rerouting of Permanent QTEL Cable to RLOC Project Site
|
Ras Laffan, Qatar
|
38
|
GAMA -Turkey
|
Qatar Gas
|
Fabrication and Installation of Pressure Piping
|
Ras Laffan, Qatar
|
39
|
Dodsal – UAE
|
Qatar Petroleum
|
Installation of Screen Cleaning System at Common Sea Water Intake Structure for Cooling Water
|
Ras Laffan, Qatar
|
40
|
JGC Middle East
|
Dolphin Energy Limited
|
Maintenance Works (at 120 m height) on HP and MP Riser of Flare Stack
|
Ras Laffan, Qatar
|
41
|
AES ROC
|
AES ROC
|
Turnkey Supply of GT Rotor Extraction Skid along with Mounting Trolleys
|
Ras Laffan, Qatar
|
42
|
Punj Lloyd – India
|
Qatar Petroleum
|
Fabrication and Installation of Dense Phase Ethylene & Butene Pipelines between Ras Laffan and Mesaieed
|
Abu Nakhlah, Qatar
|
43
|
Oil & Gas Development Company Ltd.
|
Oil & Gas Development Company Ltd
|
Turnaround Services at Uch Gas Field
|
Dera Murad Bugti, Pakistan
|
44
|
DH Chemicals
|
DH Chemicals
|
Turnkey set up of sodium hydroxide storage and decanting facility
|
Sheikhupura, Pakistan
|
45
|
Fauji Fertilizer Bin Qasim
|
Fauji Fertilizer Bin Qasim
|
Annual Turnaround at Bin Qasim Plant
|
Port Qasim, Pakistan
|
46
|
Weatherford – USA
|
Pakistan Petroleum Ltd.
|
Electrical, Mechanical and Instrumentation Works at Adam X-1 Hala early Production Facility
|
Sanghar District, Pakistan
|
47
|
Pak American Fertilizer Limited
|
Pak American Fertilizer Limited
|
Fabrication and Supply of Tube Bundles for 2 Nos. of Heat Exchangers
|
Mianwali, Pakistan
|
48
|
Wartsila
|
Nishat Chunian Power Limited
|
Civil Construction Works for 200 MW Diesel Engine based Combined Cycle Power Plant
|
Chunian, Pakistan
|
49
|
Wartsila
|
Nishat Power Limited
|
Steel Structure Erection for 200 MW Diesel Engine based Combined Cycle Power Plant
|
Chunian, Pakistan
|
50
|
OMV Pakistan
|
OMV Pakistan
|
HAZOP Study of OMV’s Kadanwari Modification and Enhancement Projects
|
Kadanwari, Pakistan
|
51
|
Chashma Nuclear Power Plant
|
CHASHNUPP
|
Annual Shutdown Maintenance Works for the Complete Power Plant
|
Chashma Barrage
|
52
|
Fauji Fertilizer Company Limited
|
Fauji Fertilizer Company Limited
|
Air Pre-Heater Coil Replacement of Primary Reformer
|
Mirpur Mathelo, Pakistan
|
53
|
Wartsila
|
Attock Gen Power Limited
|
Civil, Mechanical, Piping, Fabrication & Erection Works for 160 MW Power Plant
|
Rawalpindi, Pakistan
|
54
|
BP Pakistan
|
British Petroleum
|
Turnaround Strategy Documents for TURK Facilities Amine System
|
Mirpurkhas, Sindh, Pakistan
|
55 |
Five Solios ‐ PSA 2000 | Bechtel/Fives Solios | Pre‐Assembly and Field Erection Work for GTC‐4 |
Jubail ‐ KSA |
56 |
JCP Plant Utility Area | Saudi Chevron Phillips | Supply, Fabrication & Installation of 6” Benzene import Pipeline including Civil, Mechanical, E&I and Commissioning work in JCP Plant. |
Jubail ‐ KSA |
57 |
Rabigh 2x660MW IPP Project | Sepco III Electric Power Construction Corporation | Fuel Oil System piping & associated equipment for 2X660 MW Power Plant. Pre‐fabrication of piping, pipe supports, installation work, painting, hydro test & commissioning. Installation of ESP Equipment, ID Fan, FGD installation & GHH System including booster pumps, aeration pumps etc. Complete with commissioning for 2X660 MW Power Plant. |
Rabigh ‐ KSA |
58 |
Poly Urethane Blending Plant | Juffali Chemical Company | Engineering, Procurement & Construction (Civil, Mechanical and E & I) for the Poly Urethane Blending Plant |
Jeddah - KSA |
59 |
Styrene Monomer Pipeline Project |
Arabian Chemical Company (Latex) |
Engineering, Procurement & Construction (Civil, Mechanical and E & I) including commissioning of 12 KM 3" Styrene Monomer Pipeline through RC Corridor |
Jubail ‐ KSA |
60 |
Sales Gas Black Powder Filter Station |
Pall Corporation | Installation of Sales Gas Black Powder Filter Station at Ras Al‐Khair on the new KARZTG‐2 Pipeline going to Ma'aden Industrial City. The scope covers Electro‐Mechanical Installation and commissioning including associated Piping and Instrumentation work. |
Ma'aden ‐ KSA |
61 |
Ras Az Zawr Aluminium Smelter Project |
Fives Solios | Manufacturing of 4 Nos. Stacks with a diameter of 7.8m, height 52m and weighing 140 tons each for Ras Az Zawr Aluminum Smelter Project. | Ras Al Khair – KSA |
62 |
Bio Sludge Treatment Plant | Westech Engineering USA | Supply, Fabrication & Installation of Bio Sludge Treatment Plant. The outer dia of the tank is 39 meters and Job involves CS & SS 304 & 316 Material. | Jubail ‐ KSA |
63 |
ACCL Plant | Saudi Chevron Phillips | Design, Procurement & Construction (Civil, Mechanical and E&I) including commissioning of Insulated Styrene Pipeline from Storage Tank to RC Corridor for onward delivery to ACCL Plant. |
Jubail ‐ KSA |
64 |
Jubail Export Refinery Project Package 2B, Sulfur Amine Mechanical Works |
Daelim | Piping(2”-24”) Fabrication Works at Site, covering CS, SS & Alloy Steel Pipe. - 48,000 Dia Inches |
Jubail - KSA |
65 |
ACCL Plant | Arabian Chemical Company (Latex) |
Design, Supply, Fabrication & Installation of 2 Nos. Storage Tanks (Vertical & Horizontal) and 2 Nos. of Heat Exchangers | Jubail - KSA |
66 |
Saudi Aramco Shell Refinery SCOT & SWS4 Project |
JGC Gulf Co. Ltd | Steam Tracing work on approx. 5.000 meter of Process Piping with 100% RT including Hydrotest. Scope of work also includes Reinstatement work of Process Piping after Hydrotest including Commissioning assistance. | Jubail - KSA |
67 |
Butadiene Pipeline Project |
Arabian Chemical Company (Latex) |
Revalidation, Modification & Painting of Butadiene Pipeline in Royal Commission Corridor. |
Jubail - KSA |
68 |
SASREF Annual Turnaround |
SULZER | Column Revamp Services during Annual Turnaround |
Jubail - KSA |
69 |
Jana Shutdown - Calcium Chloride Plant |
Jana Chemicals | Replacement of Fiber Glass Storage Tanks and Associated Equipment during Plant Shutdown | Jubail - KSA |
70 |
Qatar Petroleum | Qatar Petroleum | EPIC of new LGO Tank (2114F1) and Utilization of LC Tank 2145FA for LGO service at QP Refinery | Mesaieed, Qatar |
71 |
Qatar Petroleum | Qatar Petroleum | EPIC of Connecting Water Tanks header to 24” Kahramaa Water Line in Dukhan Fields | Dukhan, Qatar |
72 |
Dolphin Energy Limited | Dolphin Energy Limited | Frame work Construction call-off works (Onshore) | Ras Laffan, Qatar |
73 |
Dolphin Energy Limited | Dolphin Energy Limited | Offsite pipeline protection works at Ras- laffan on –shore offsite facilities (RLIC-Common Corridor) | Ras Laffan, Qatar |