MANUFACTURING 

 

Once fully setup, Etimaad manufacturing shop will spread over an area of 100,000 square meters. The facility will;

  • Be equipped with a state of the art automatic spool fabrication,
  • Manufacture pressure vessels, heat exchangers, columns, conventional boilers/waste heat boilers, and
  • Manufacture pre-engineered skid packages.

The shop will have the capability to deliver over 100,000 tons of fabricated equipment for oil and gas, chemical, petrochemical, power, fertilizer, cement and sugar industries. The design and manufacturing processes in the shop will follow the latest and stringent QHSE standards with ASME, ISO and European Union CE certifications.

WHAT CUSTOMER SAYS


We are pleased to advice that Etimaad Engineering is executing work to our satisfaction. We expect that they will continue to perform in an excellent manner on this project.

Zulqarnain Mustufa

Project Manager

Attock Gen Limited for Wartsila
The Etimaad team demonstrated a great sense of commitment and consistency in the project management capability , upholding strict quality and safety measures that helped us achieve the completion of our project within a record time of six months. PPR congratulates Etimaad for its contribution and successful completion of design review on this project of national significance.

Razi Ahmed

Director (Project Development)

Bhikhi Power Plant for Pakistan Power Resources, LLC
This is to certify that M/S Etimaad have successfully completed the job of "E-207, New Coil Installation & E-205 B/C, Coil Replacement." They have performed the job of good quality, timely, safely and according to the specifications provided to them. We wish to express our gratification for their efforts to complete the job within the specified duration and services rendered to our company..

Syed Masroor Ali

Maintenance Manager (Mechanical)

Fauji Fertilizer Company Limited
We really appreciate the response and services provided by M/S Etimaad for fixing the Super heater tubes leakages on our HRSG#4 during its forced shut down from 1st to 4th of November-08. We understand the special welding procedure requirement for the T91 material and the difficult location of the defective tubes made the tube welding a difficult task. However, the expertise available with M/S Etimaad Qatar, LLC helped to pass the welding in one go which in turn led to minimize the shut down on our HRSG#4. We are looking forward to the same sort of services in future from Etimaad Engineering helping us to enhance reliability of our plant.

Maqsood Ahmad

Maintenance Manager (Mechanical)

Fixing The Tube Leakages on Heat Recovery Steam Generator for AES Ras Laffan Operating Company (WL.L.), Qatar